PGSplice - can only be used for simply-supported bridge?

1 post / 0 new
yushunxin
PGSplice - can only be used for simply-supported bridge?

1. It seems that PGSplice can only be used for simply-supported bridge, isn't it?
2. Can I manually schedule the detail construction sequence using time-list? e.g. to make post-tensioning before lifting and shipping, or keep the girder in position for a longer period before deck placement.
3. My present bridge has 2 carriageway divided by an interior barrier, is this beyond PGSplice's capability? in PGSuper, I tried to use sidewalk option to replace one half carriageway so that interior barrier can be counted, but this would cause the wrong live load distribution.

I'm looking forward to the future better PGSplice and PGSuper.

yushunxin