New Girder Schedule Information per Design Memorandum April 13, 2017

2 posts / 0 new
Last post
yanzliu
New Girder Schedule Information per Design Memorandum April 13, 2017

Hi Rick,

I see WSDOT Girder Schedule from PGSuper includes Maximum Midspan Vertical Deflection at Shipping but the result does not show. Is that something still under development?

Thanks,
Yan

Rick Brice
WSDOT Girder Schedule

Version 3, which is part of the BridgeLink suite, provides the current girder schedule information. This is mentioned in the design memo. The following technical note provides additional information, including a procedure for obtaining the new girder schedule information for versions of PGSuper before 3.0.

http://www.wsdot.wa.gov/eesc/bridge/software/PGSuper/TechNotes/TN002.pdf

Log in or register to post comments