PGSuper.com Newsletter

Subscribe and keep up to date with all things happening at PGSuper.com.

Come See Us at the International Bridge Conference, June 10-12, 2019 - Washington, DC

Come See Us at the International Bridge Conference, June 10-12, 2019 - Gaylord National Convention Center, Washington, DC – Booth #329

BridgeSight will be unveiling new BridgeLink Professional software which includes new versions of PGSuper Professional, PGSplice Professional and a host of other bridge engineering tools. New features include Multi-span, Multi-stage Post-tensioned Spliced Girder Design, transformed section analysis, stand-alone girder handling and shipping analysis, and much more!!

Announcing BridgeLink Professional 4.0

January 9, 2019 - BridgeSight announces BridgeLink Professional Version 4.0, PGSuper Professional 4.0.11 and PGSplice Professional 4.0.11. This new release introduces many new features to our conventional prestressed-precast bridge design offerings.

BridgeLink Professional

BridgeLink Professional includes PGSuper Professional, PGSplice Professional, and the Bridge Engineering Toolbox. BridgeLink Professional provides unprecedented capability to design and analyze precast concrete bridges. More information about BridgeLink Professional can be found at:

Announcing BridgeLink Professional 2.1.1

March, 13 2018 - BridgeSight is proud to announce BridgeLink Professional Version 2.1.1, PGSuper Professional 2.1.1 and PGSplice Professional 2.1.1 in concert with the Washington and Texas Departments of Transportation recent release of BridgeLink 1.1.5. This new release is a maintenance release that fixes several bugs. We recommend that all users update as soon as possible.

Updated PGSuper.com Tutorial - Modelling Touch Shoring with PGSuper

The new version of PGSuper and BridgeLink was released in July, and we are starting the arduous task of updating our white papers and tutorials. The first is an update of our tutorial on modelling touch shoring in PGSuper.

The application of touch shoring is a useful method to reduce final stresses in the composite deck and girder system. In certain cases this can increase the allowable span length or spacing of girders.

The new tutorial is at https://www.pgsuper.com/content/modeling-touch-shoring-pgsuper

Cheers, and Happy Fall, 2017,
Richard Pickings, P.E.

BridgeSight Inc.

Come See Us at the Western Bridge Engineers Seminar, September 6-8, 2017 – Portland, Oregon

Come visit us at the Western Bridge Engineers Seminar, September 6-8, 2017 – Portland Marriott Downtown Waterfront, Portland, Oregon – Booth #407

BridgeSight will be unveiling our new BridgeLink Professional software which includes new versions of PGSuper Professional, PGSplice Professional and a host of other bridge engineering tools. New features include Multi-span, Multi-stage Post-tensioned Spliced Girder Design, transformed section analysis, stand-alone girder handling and shipping analysis, and much more!!

Announcing BridgeLink Professional 2.0

July, 13 2017 - BridgeSight announces BridgeLink Professional Version 2.0, PGSuper Professional 2.0 and PGSplice Professional 2.0 in concert with the Washington and Texas Departments of Transportation recent release of BridgeLink 1.1. This new release introduces multi-span, multi-stage post tensioned spliced girder analysis, and many new features to our conventional prestressed-precast bridge design offerings.

Come visit us at the International Bridge Conference, June 4-8, 2017

Come visit us at the International Bridge Conference, June 4-8, 2017 – Gaylord National Resort & Convention Center, National Harbor, MD – Booth #445

BridgeSight will be unveiling our new BridgeLink Professional software which includes new versions of PGSuper Professional, PGSplice Professional and a host of other bridge engineering tools. New features include Multi-span, Multi-stage Post-tensioned Spliced Girder Design, transformed section analysis, stand-alone girder handling and shipping analysis, and much more!!

Designing and Load Rating Bridges for Oregon DOT just got Easier!

New Oregon DOT Slab and Box Beam Shapes for our PGSuper Professional Library

BridgeSight has just updated our PGSuper Pro ODOT library with new Slab and Box Beam shapes. This means that all standard ODOT precast girder shapes and specifications are now just a couple of mouse clicks away. A table of our ODOT shapes is shown below. For more information, check out http://www.pgsuper.com/Oregon

Come see us at the Pacific Northwest Bridge Maintenance Conference, Portland OR, October 11-13, 2016

October 11-13, 2016, Red Lion Hotel on the River - Jantzen Beach, Portland, OR

Check us out at Booth (#23) on the conference floor to show the latest versions of PGSplice and PGSuper Professional. Come by to see latest features and to learn more about PGSuper and the upcoming release of PGSplice. We’ll also be offering special discounts on PGSuper Professional and will be giving away some cool stuff.

I hope to see you there!

Richard Pickings
President, BridgeSight Inc.

Announcing PGSuper Professional 1.6.1 and PGSuper 2.9.2

BridgeSight proudly announces the release of PGSuper Professional Version 1.6.1 in concert with the Washington and Texas Departments of Transportation release of PGSuper Version 2.9.2. This is a maintenance update that fixes several minor bugs and some program crashes. A detailed list can be found at: http://www.wsdot.wa.gov/eesc/bridge/software/index.cfm?fuseaction=releas...

We highly recommend that you upgrade your installation of PGSuper as soon as possible.

New Features in PGSuper Professional 1.6.1

Pages

Subscribe to RSS - PGSuper.com Newsletter