PGSuper.com Newsletter

Subscribe and keep up to date with all things happening at PGSuper.com.

Announcing BridgeLink Professional 5.0

April 20, 2020 - BridgeSight announces BridgeLink Professional Version 5.0, PGSuper Professional 5.0.2 and PGSplice Professional 5.0.2. This new release introduces many new features to our spliced and conventional prestressed-precast bridge design offerings.

BridgeLink Professional

Alert! : Computational bug in PGSplice 4.1.5

January 21, 2020 - WSDOT Engineers have identified a bug for U-Beams in PGSplice 4.1.0-4.1.5. Secondary Post Tensioning effects are not computed correctly for all stressing stages for U-Beams.

When there are multiple stages for PT for U-Beams, the secondary effects of PT are not computed for the later stages. Investigation of the source code for generating the load revealed that the input number of ducts, not the actual number of ducts is used resulting in 1/2 of the actual PS force.

New Updated PGSuper Configuration Libraries for CalTrans, Oregon DOT and PCINE. For LRFD 8th Edition

January 13, 2020
BridgeSight is pleased to announce the release of updated PGSuper Professional Configurations for the California Department of Transportation, Oregon DOT, and PCI North East. All configurations were updated for compliance to the AASHTO LRFD Bridge Design Specifications 8th Edition 2017 and including DOT amendments for CalTrans and ODOT. More details on the configurations can be found at:

Come See Us at the Western Bridge Engineers Seminar, September 4-6, 2019 - Boise, ID

Come See Us at the Western Bridge Engineers Seminar, September 4-6, 2019 - Boise, ID – Booth #54

BridgeSight will be unveiling new BridgeLink Professional software which includes new versions of PGSuper Professional, PGSplice Professional and a host of other bridge engineering tools. New features include Multi-span, Multi-stage Post-tensioned Spliced Girder Design, transformed section analysis, stand-alone girder handling and shipping analysis, and much more!!

Come See Us at the International Bridge Conference, June 10-12, 2019 - Washington, DC

Come See Us at the International Bridge Conference, June 10-12, 2019 - Gaylord National Convention Center, Washington, DC – Booth #329

BridgeSight will be unveiling new BridgeLink Professional software which includes new versions of PGSuper Professional, PGSplice Professional and a host of other bridge engineering tools. New features include Multi-span, Multi-stage Post-tensioned Spliced Girder Design, transformed section analysis, stand-alone girder handling and shipping analysis, and much more!!

Announcing BridgeLink Professional 4.0

January 9, 2019 - BridgeSight announces BridgeLink Professional Version 4.0, PGSuper Professional 4.0.11 and PGSplice Professional 4.0.11. This new release introduces many new features to our conventional prestressed-precast bridge design offerings.

BridgeLink Professional

BridgeLink Professional includes PGSuper Professional, PGSplice Professional, and the Bridge Engineering Toolbox. BridgeLink Professional provides unprecedented capability to design and analyze precast concrete bridges. More information about BridgeLink Professional can be found at:

Announcing BridgeLink Professional 2.1.1

March, 13 2018 - BridgeSight is proud to announce BridgeLink Professional Version 2.1.1, PGSuper Professional 2.1.1 and PGSplice Professional 2.1.1 in concert with the Washington and Texas Departments of Transportation recent release of BridgeLink 1.1.5. This new release is a maintenance release that fixes several bugs. We recommend that all users update as soon as possible.

Updated PGSuper.com Tutorial - Modelling Touch Shoring with PGSuper

The new version of PGSuper and BridgeLink was released in July, and we are starting the arduous task of updating our white papers and tutorials. The first is an update of our tutorial on modelling touch shoring in PGSuper.

The application of touch shoring is a useful method to reduce final stresses in the composite deck and girder system. In certain cases this can increase the allowable span length or spacing of girders.

The new tutorial is at https://www.pgsuper.com/content/modeling-touch-shoring-pgsuper

Cheers, and Happy Fall, 2017,
Richard Pickings, P.E.

BridgeSight Inc.

Come See Us at the Western Bridge Engineers Seminar, September 6-8, 2017 – Portland, Oregon

Come visit us at the Western Bridge Engineers Seminar, September 6-8, 2017 – Portland Marriott Downtown Waterfront, Portland, Oregon – Booth #407

BridgeSight will be unveiling our new BridgeLink Professional software which includes new versions of PGSuper Professional, PGSplice Professional and a host of other bridge engineering tools. New features include Multi-span, Multi-stage Post-tensioned Spliced Girder Design, transformed section analysis, stand-alone girder handling and shipping analysis, and much more!!

Announcing BridgeLink Professional 2.0

July, 13 2017 - BridgeSight announces BridgeLink Professional Version 2.0, PGSuper Professional 2.0 and PGSplice Professional 2.0 in concert with the Washington and Texas Departments of Transportation recent release of BridgeLink 1.1. This new release introduces multi-span, multi-stage post tensioned spliced girder analysis, and many new features to our conventional prestressed-precast bridge design offerings.

Pages

Subscribe to RSS - PGSuper.com Newsletter